Solar Land for sale in Bikaner Rajasthan

Bikaner Rajasthan

Download Solar Land for sale in Bikaner Rajasthan BROCHURE Here!

Download Solar Land for sale in Bikaner Rajasthan BROCHURE Here!

Solar Land for sale in Bikaner Rajasthan

Bikaner Rajasthan

SIZES

70 Acres | 100 Acres | 150 Acres | 350 Acres | 1000 Acres

UNITS

Solar Land

STARTING FROM

Price on Call

Current Offers

OVERVIEW

Solar Land for sale in Bikaner Rajasthan

Pre leased Solar Land

Top Tenants: Tata, Adani & other Fortune 500 Companies
Land Sizes Available: 70 Acres | 100 Acres | 150 Acres | 350 Acres | 1000 Acres

Pricing: ₹6.5 Lakh Per Acre – Premium Land with Top Corporates

Investment Highlights:
• Lease Tenure: 29 Years & 11 Months
• Lock-in: Entire Lease Period – Full Security
• Escalation: 5% every 2 years – Guaranteed Growth
• Example Deal: Invest in 100 Acres @ ₹6.5 Cr and earn ₹25 Lakh/annum Fix assured rental

Why Bikaner?
• Emerging Industrial Powerhouse
• Govt. Infrastructure Push
• Assured Rental + Future Appreciation

Preference to Top Class Companies Only
Limited Inventory | Site Visit On Request

Connect Now – Secure Your Share in the Next Big Growth Corridor!

_Act before inventory getting exhausted._

More Details Call

KEY FEATURES

solar land for sale in Bikaner, Rajasthan, suitable for solar energy projects. These Land range from 75 acres to 1000 acres and are primarily in near Bikampur, Bajju, Pugal phalodi, baadmer, jaisalmer Khajuwala Bikaner district Rajasthan

Locations: Properties are available in various locations, including Bikampur, Bajju,  Pugal phalodi, baadmer, jaisalmer Khajuwala Bikaner district Rajasthan. 

Land Purpose: Specifically targeted for solar power plant development. 

Benefits of Investing in Pre-Leased Land Properties:
  • Guaranteed Rental Income:

    As the Land property is already rented, investors can expect a consistent income stream. 

  • Reduced Risk:

    Pre-leased properties offer a lower risk investment compared to residential properties. 

  • Potential for Appreciation:

    While rental income is a key benefit, pre-leased Land properties can also appreciate in value over time. 

  • Hassle-Free Investment:
    Investors can avoid the complexities of finding and managing Top tenants. 

 

PRICE LIST & FLOOR PLAN

AMENITIES

luxury-real-estate-logo-collection-with-golden-vector-32036840

SCHEDULE SITE VISIT OR VIRTUAL TOUR

Location Advantages

Introduction

The 450 MWp solar project in Bikaner, Rajasthan, was completed with the objective of promoting sustainable power generation and driving economic development in the region. The scope of the project involved the installation of two solar power projects, a TPGEL (Tata Power Green Energy Limited) (225 MW (AC) / 310 MWp (DC), a PPA with TPCD (Tata Power Company Distribution) and a TPSL (TP Saurya Limited) (110MW (AC) /140MWp (DC), a PPA with KSEB (Kerala State Electricity Board). The key stake holder for this project includes power producers, local residents, and government agencies who are driven by a common motto “Sustainability”.

Objectives

The key objectives of the 450 MWp solar power project were to:

  • Generate sustainable and renewable power in the Bikaner region of Rajasthan.
  • Contribute to the region’s socio-economic development through the creation of job opportunities and infrastructure.
  • Minimize the carbon footprint of the region.

 

Key Project Features

The solar power project in Bikaner, Rajasthan, highlighted several innovative technologies and design methods to increase its efficiency. Some of the key project features were:

  • Project type: Power Producers
  • Project Bifurcation: 225 MW for TPCD and 110 MW for KSEB.
  • Project completion time: 7 Months for the 225 MW project and 5 months for the 110 MW project.
  • Number of Modules: 5,78,928 for the 225 MW project and 2,58,076 for the 110 MW project.
  • CO2 Offset: 4,29,200 lakh by the 225 MW project and 2,02,880 lakhs for the 110 MW project.
  • Module Technology: Mono crystalline module Bifacial for the 225 MW project, Mono PERC half-cell double glass module for the 110 MW project.

 

Project Implementation and Challenges

The project faced several challenges during its implementation, including:

  • Tough land profile: The land profile in the region posed difficulties in setting up the solar infrastructure. This challenge was overcome by conducting area grading to accommodate the necessary equipment.
  • Extreme weather conditions: The project took place during harsh weather conditions, such as temperatures above 50°C, severe winter, and sandstorms. To combat this, teams worked in break shifts to safeguard worker’s health.
  • Geopolitical Challenges: Local and geopolitical challenges addressed during project execution in an effort to win the hearts of the local community, Tata Power Solar initiated numerous programs at the site. From providing technical training and livelihood opportunities to focusing on women’s health and implementing innovative educational projects like “lab on bike” for children, the company made community engagement an integral part.

The project achieved India’s first 100% CEA Compliance by installing capacitor banks for reactive power compensation, ensuring a smooth flow of electricity.

ENQUIRE NOW

LOOKING TO BUY IN THIS PROJECT?

REGISTER YOUR INTEREST HERE

ENQUIRE NOW

NO BROKERAGE | BEST DEAL Guaranteed